Inclusions
PRELIMINARIES
* Development of concepts plans and preparation of full working drawings
* Structural Engineering design and documents for !oor slab and structural beams
* Building Permit and associated fees
* Home Owners warranty Insurance, Contract Works insurance
* Planning Permit
ENERGY EFFICIENCY
* Energy Rating and Assessment Report
* Required insulation as per the building code to achieve required star rating
* Upgrades to achieve mandatory minimum Energy Rating may be required depending on “nal design, siting and orientation
OH&S REQUIREMENTS
* Perimeter scaffolding, hanging scaffold and/roof edge handrails as required for safe construction access
* Temporary fencing to council/Developer requirements
SERVICES
* Connections to Water, Sewer, Storm water, Electricity and Gas
* Termite Collars to plumbing pipework. Initial application of termite chemical (owner is responsible for regular inspections and re-treatment of perimeter)
* Telstra Lead in conduit and draw wire from pit
* Single phase underground power supply
SITE COSTS
* Site survey and soil investigation
* Rock excavation and removal
* Fixed Site costs
STRUCTURAL
* 25500mm nominal Ground Floor ceiling height
* 2550mm nominal First Floor ceiling heights
* 2400mm nominal Second story
* Timber sizes and framing in accordance with Australian Standards and Structural Engineer’s requirements
EXTERNAL FINISHES
GROUND FLOOR:
* As per drawings
FIRST FLOOR
* As per drawings
SECOND FLOOR
* As per drawings
ROOFING
* Zincalume Kliplok to “Flat” upper roofs, Colorbond Kliplok to flat lower roofs
* Colorbond parapet capping
* Colorbond fascia and quad eave gutters
* Colorbond 100mm x 50mm rectangular downpipes. Colorbond rainheads (as required)
EXTERNAL DOORS & WINDOWS
* Entry door – 2040 high, 820 wide.
* Awning windows to front elevations. Sliding to remaining
* Fiber mesh flysreens to all opening windows & Flydoors to sliding doors
INTERNAL FINISHES
* 10mm plasterboards