Designed as a three stage development with Stage 1 having approval for 5 townhouse this stage has already constructed road and connectable to existing services. Stage 2 is a 9 lot subdivision that is incorporated with a parallel development, and Stage 3 would be a two lot rural residential subdivision with access from stage 2 in the current design. Section 94 Contributions have been paid for stages 1 and 2 , and the services have the capacity to handle the approved developments so there should be no further costs other than road construction for Stage 2.
An opportunity fora land banking investor or developing in a rising market to acquire 4.078 Hectares with considerable DA approval and section 94 paid.