Development approved 14.16 hectares zoned residential 2 (a). An outstanding opportunity exists with this 35 acre parcel of beauty land that is only about 10 minutes from the new (H.E.Z) Hunter Economic Zone- Industrial Park(www.hez.com.au). The property has a fresh approval for at least a 26 lot rural residential subdivision and the provision of water, power and sewer to site. But if that’s not enough, the residential 2(a) zoning permits lots with a minimum of 450m2. There is a plan available showing a possible 95 lot residential subdivision. Numerous amounts of information is available on request: *Section 96 application *Full in depth statement of environmental effects *Flora and fauna report *Traffic reports and assessment *Drainage and engineering *Draft 88B instrument *Development determination and granting of consent dated 7th February 2007 and lapses 13th February 2012. Just to name a few; a good 226 pages and more of healthy reading.
Enquiries should be directed to
Terry Hansen
terry.hansen@bigpond.com
0418 245 683 or (02) 9673 4422