PLEASE FIND BELOW A FULL SPEC SHEET OF ALL ITEMS ASSOCIATED WITH THIS SITE.

OUTGOINGS:

Land Tax pa. $575.39
Rates – City of Fremantle $3512.78
Insurance Zurich Aust. $1571.67.
Water Rate $1089.66 = $6749.50 + gst
+ Management 7.7%

Workshop & Garage 385 m2
Ground floor office @ WC (2) 21.0m2
Outside container attached roof to building 38 m2
Washdown Pad 18 m2
Hard stand (asphalt) 539 m2
Entrance Office 3550 x 3450 with 2 phone lines plus 1 phone and 2 data points. Reverse Cycle Air
Second ground floor office 3450 x 2450 with 2 phone lines plus 1 phone
Up stairs office/storage (L shape) 3450 x 4050 and 2350 x 2100. one phone point and phone and one data point. Reverse cycle air conditioner
Up stairs office /storage/work room with 2 benches. 5000 x 1950. one phone point with phone, one data point. Reverse cycle air conditioner
Security System with 3 internal censors and one external beam censor.
5 of 20 amp 3 phase plugs and 1 outside
1 of 63 amp 3 phase welder outlet
4 of 15 amp single phase (1 outlet) plug
8 of 10 amp single phase (2 outlet) plugs
2 of 10 amp single phase (2 outlet) plugs (outside)
10 flood lights inside
2 floodlights outside
Large extractor fan in roof
Mezzanine floor 8900 x 3550 with 3 double fluro lights underneath
Compressed Air plumbing with 4 outlets
200 ltr rain water tank
6000 x 2400 sea container with pipe/steel rack attached and 9300 x 2500 roof to side wall.
Wash down pad 6600 x 3000 with VGS
Industrial separation system connected to sewer.

PLEASE E-MAIL ME TODAY FOR ANY FURTHER DETAILS