920mm Stained Front Feature Door
20mm Stone top to Bathroom & Ensuite Vanity
900mm Appliance Upgrade Freestanding with Gas Cooktop
Ducted Air Conditioning
Rendered Letterbox
Full Turn Key
Full Height wall tiles to Bathroom and Ensuite
Fully Landscaped & Fenced

PRE-CONSTRUCTION
• HIA fixed site works.
• Plans – Specifications.
• Engineers soil report & slab design.
• Council building application fees.

SITE WORKS FOUNDATIONS & CONNECTIONS
• Site scrape and/or balanced cut & fill excavation for up to 1500mm site fall over the building platform.
• Engineer designed concrete slab to suit up to “H2” slab with bulk concrete piering (up to and including a depth of 600mm).
• Termite treatment to slab penetrations and physical perimeter barrier.

KITCHEN INCLUSIONS
• 20mm manufactured stone benchtop.
• Laminate finish cupboards from the standard builder’s range of laminates.
• Door handles from the standard builder’s range.
• Laminate finish microwave oven provision to cabinetry.
• 600mm under-bench oven.
• Electric Ceramic 600mm cooktop.

Important: The Pictures are indicative only as we don’t have real pictures ,Whilst every care is taken in the preparation of the information contained herein,we will not be held liable for any errors in typing or information. All information is considered correct at the time of printing. Any interested parties should satisfy themselves in this respect.

December Registration